Top
Online Service
Hello, welcome to AT Oil and Gas Development Mall ! To provide you with better service, please login in
Sign in
Join for free

Welcome to AT Oil and Gas Development Mall !

PROVISION OF PERMANENT PRESSURE AND TEMPERATURE DOWNHOLE GAUGE EQUIPMENT AND SERVICES FOR ONSHORE AND OFFSHORE WELLS

2024-03-06

Views:44

General:
GT24101400

Bond:
1800000

Tender Issue Period:
22/02/24 - 28/02/24


Bid Closing Date
24/03/24

Fee:

500

Bond Validity:
21/08/24- (150) days from the Bid Closing Date

Offer Validity:
22/07/24- (120) days from the Bid Closing Date

Scope of Work/Description:
Brief of Scope of Services 1.,,QatarEnergy requires the Services of an experienced and technically sound Contractor for the provision of Permanent Pressure and Temperature Downhole Gauges in QatarEnergy's Onshore and Offshore wells on Call-off basis. The Contractor shall provide all personnel, supervision, equipment, tools, materials, transportation, storage and all items of expense and associated services to perform the Services. 2.,,The Scope of Services shall involve supply of equipment, spare parts and services for the installation, commissioning and maintenance of permanent downhole pressure, temperature gauges systems to suit various well tubing/casing sizes ranging from 2-3/8" to 7" O.D., temperatures ranging from 90 to 149 (deg. C) and pressures from 2200 to 6300 psi; and shall include provision of but not limited to the following: 2.1,,Permanent downhole pressure and temperature gauges acquisition, equipment, labor, services, supervision, testing, tools, inspections, maintenance, repair, redress, transportation, all equipment required for the complete installation and maintenance of the specified system items. 2.2,,Engineering support until the system is fully operational as per design specifications, including preparation at QatarEnergy's base, installation of the gauges, cable routing through junction box & data acquisition unit, cable connection to data transmission system, provision data link and operations engineering requirements such as job proposals, simulations software, calculations, evaluations, recaps and reports. 2.3,,Adequate manpower and specialist Contractor Personnel to provide full support, installation including well site technical support. Such support shall cater for working on the rig during running-in/installation of the completion string and during commissioning of the data acquisition system until the system is fully operational/ functional. 2.4,,Main and contingency equipment, tools, consumables, spares and non-consumables for a successful installation and commissioning, as well as an adequate inventory of spare parts and maintain fully equipped and functional base [workshop/ warehouse, laboratories (if required)] and facilities in Qatar for the Services and whenever required post installation until the end of Guarantee Period. 2.5,,All onsite civil and mechanical work required for installing surface units, including its installation and termination. 3.,,Contract Duration for the Services shall be sixty-three (63) months including three (3) months for initial mobilization. 4.,,Guarantee Period for the Services shall be 1 year from Completion of Services under each individual RO and QatarEnergy acceptance thereof.


Note:

a) Tender documents for the above services/works/goods can be obtained from the Dates of Issue within the Tender Sale Period. Tender Issue Time ends at 2 PM (local time) of the Sale period's end date.

b) Suppliers and Contractors who are already registered with QatarEnergy via e-Registration system and are in possession of a valid SAP ID issued by QatarEnergy can buy the Tender document online using the Buy Tender Online link within the Tender Issue Period indicated above.

c) Requests for issuance of Tenders after the specified Tender Issue Period will not be entertained. QatarEnergy reserves its right, in its own discretion, to set and recall Tender Issue Periods.

d) No queries will be entertained, or bids received, from entities who have not purchased tender documents in compliance with the above provisions.

e) All prospective Contractors/suppliers interested to participate in QatarEnergy Tenders are required to register and obtain a QatarEnergy SAP Vendor Code, a mandatory requirement for the issue of Tender Document.

f) All bidders shall ensure that the business/company name, contact persons and other details in all relevant documents to reflect the details as stated in the commercial registration documents.

g) Bidders/Contractors, who are registered with QatarEnergy and possess a QatarEnergy SAP Vendor ID, shall with immediate effect ensure that any change to the vendor details is updated with QatarEnergy via e-Registration to ensure smooth processing of Tender, Contract and Payment related matters without any delay.